Gas grid of the future

The German TSOs are making an important contributing to the security of energy supply with the existing gas infrastructure. In order to ensure future reliability of the network, a network development plan (NDP) is submitted to NEP Gas every two years. This plan is then published, consulted and approved by the Federal Network Agency. When the NDP is approved, TSOs assure implementation of the measures listed.

A welder, wearing protective gear including a helmet and gloves, is welding a pipe at the construction site of the Embsen compressor station. The welder is kneeling on the ground surrounded by cables and equipment, with large pipes and industrial components visible in the background.
Construction of compressor station Embsen - as part of the NDP