Pipeline network details
This page outlines the latest information on our pipeline network.
Length of the pipeline network
| Length of the pipeline network (KM) | |
| LOW PRESSURE | 0 |
| MEDIUM PRESSURE | 0 |
| HIGH PRESSURE | 4.662 |
Pipeline sections included:
- inclusive inoperative sections
- inclusive DEUDAN, NETRA
- inclusive leased sections
- exclusive leased out sections
- exclusive (permanent) decommissioned sections
Length of high pressure pipeline network categories (DIA):
| Pipeline diameter (mm) | Length of the pipeline network (KM) | |
| A | X >=1000 | 1.931 |
| B | 700 <=x< 1000 | 713 |
| C | 500 <=x< 700 | 782 |
| D | 350 <=x< 500 | 418 |
| E | 225 <=x< 350 | 490 |
| F | 110 <=x< 225 | 312 |
| G | x < 110 | 16 |
| TOTAL | 4.662 |
Number of delivery stations
| Pressure | Amount |
| LOW PRESSURE | 0 |
| MEDIUM PRESSURE | 0 |
| HIGH PRESSURE | 203 |
Gas quality
Here you will find information on the gas quality.
Annual quantities and maximum annual load 2023
The annual quantities of regional distribution companies and end-customers amounted to 267,944,476,013 kWh. The simultaneous maximum annual load, occurred on 6 February 2023 at 06.00 p.m., amounted to 45,234.396 MWh/h.